IP Camera Installation Checklist

Purpose

Use this checklist for every IP camera installation to ensure consistent, professional results. Complete each section in order.


Pre-Installation

TaskNotes
Review site drawings / camera placement planConfirm FOV covers target area
Confirm camera model and lens match job specs
Check PoE switch has available ports and power budgetPoE: 15.4W, PoE+: 30W
Verify cable run path — no sharp bends, not near high-voltageMax Cat6 run: 100m (328ft)
Confirm mounting surface is structurally soundConcrete anchor for concrete/block walls
Have correct conduit / junction box if required
Have correct mounting hardware (wedge mount, pendant, surface)
Confirm camera firmware and VMS compatibility

Cable Run

TaskNotes
Pull Cat5e/Cat6 cable from IDF/MDF to camera locationLabel both ends
Test cable with cable tester before terminatingAll 8 pairs, check for opens/shorts/splits
Terminate RJ45 using T568B standard
Punch down to patch panel at switch endLabel patch panel port
Verify cable length does not exceed 100m total (cable + patch)
Weatherproof cable entry if outdoors (drip loop, silicone)

Mounting

TaskNotes
Mark and drill mounting holesUse camera base as template
Install anchors / back box as required
Feed cable through mounting base
Mount camera — do not overtighten
Connect cable to camera (RJ45 or pigtail)
Seal cable entry if outdoor installationUse manufacturer-supplied gasket or conduit fitting

Power-Up & Commissioning

TaskNotes
Plug into PoE switch — verify link light comes on
Camera powers on (status LED active)Allow 2–3 min for boot
Camera receives IP via DHCP or set static IP per project standards
Ping camera IP to confirm network connectivity
Add camera to VMS (Genetec, Milestone, Exacq, etc.)
Verify live video feed in VMS
Adjust lens / aim to cover intended FOVCheck image in VMS, not just physically
Configure recording schedule and retention per client requirements
Verify recording is active and motion detection triggers correctly
Label camera in VMS with agreed naming conventione.g. SITE-AREA-CAM01

Outdoor-Specific

TaskNotes
Confirm camera has appropriate IP66/IP67 rating for exposure
Apply drip loop to cable before entry point
Use conduit or corrugated loom on exposed runs
Tighten all weatherproof fittings / gaskets
Check for IR reflection from nearby surfaces (night mode)

Final Sign-Off

TaskNotes
All cameras visible in VMS with correct names
Recording confirmed on all cameras
No loose cables or exposed wire runs
Cleanup completed — packaging, scrap cable disposed
Document IP addresses, MAC addresses, port assignments
Client walkthrough completed if required